Went to the unit last night, in the snow (most of it's gone now). I turned up with a list of things to do. This was the start of the evening:
1st things 1st, I wrapped the car up and took my jacket off for some serious hammer use:

I started by hacking the endplates off the B/J beam that is going to be the basis for my narrowed beam.

Those POS adjusters are going in the bin to be replaced by a nce set of Sway-a-Ways. The picture below shows a quick mock up of the end plates I got laser cut (yes I know I messed up on one of the dimensions but I can rectify this)
You may notice that I have put the nearside endplate on the offside of the beam but this was just done as a quick trial assembly.

And for those who actually have nothing better to do than read my Blog you may be asking yourself, didn't he say he was going to be doing a new spare wheel trough this is the progress to date, but I looked at it last night and I think I will be starting all over again as I'm not impressed by what I've done so far.
